Stuart C. Poage, of the Tallahassee office, obtained a favorable settlement in a case involving claims for alleged property damage related to a major renovation. Our client performed the renovation to Plaintiff’s home, which was originally built in the 1940’s. Our client, in turn, retained a subcontractor for part of the work. The subcontractor designed and installed an HVAC system for the two-level house. Because of the age of the home, the design limitations, and Plaintiff’s unwillingness to be flexible in the renovation, several issues arose as a result of the renovation and installation of the HVAC system. Areas of condensation and excess moisture appeared which allegedly caused damage to interior portions of the home. Plaintiff spent significant money making betterment-style repairs, and was prepared to argue entitlement to these damages and additional loss of use claims at trial. The matter was settled right before trial for a mere fraction from each Defendant, thereby limiting our client’s liability and avoiding the costs and risks associated with taking the case to trial.